1、当开挖施工时,如挖到燃气警示带,则体现在下方0.30.5米处有燃气管道,起到了警示和;ぷ饔谩2、示踪作用。寻找地埋燃气管道时,找到警示带即找到了管道,起到了示踪作用。3、现在的警示带有示踪线,使用测试仪器在不开挖的情形下,准确为管道定位。
1. When excavating, if a gas warning tape is dug, it indicates that there is a gas pipeline located 0.3 to 0.5 meters below, which serves as a warning and protection. 2. Tracing effect. When searching for buried gas pipelines, finding the warning tape indicates that the pipeline has been found, playing a tracing role. 3. The current warning is equipped with a tracer line, which uses testing instruments to accurately locate the pipeline without excavation.
燃气管道警示带埋设要点
Key points for burying warning tapes for gas pipelines
1.沟槽开挖。
1. Trench excavation.
(1)混凝土路面和沥青路面的开挖应使用切割机切割。
(1) The excavation of concrete pavement and asphalt pavement should be done using a cutting machine.
(2)管道沟槽应按设妄想定的平面位置和标高开挖。当接纳人工开挖且无地下水时,槽底预留值应为0.05~0.10m;管道装置前应人工清底设计标高。
(2) The pipeline trench should be excavated according to the plane position and elevation specified in the design. When manual excavation is used and there is no groundwater, the reserved value at the bottom of the trench should be 0.05-0.10m; Before pipeline installation, the bottom should be manually cleaned to the design elevation.
(3)管沟沟底宽度和事情尺寸,应凭证现场现真相形和管道敷设要领确定。
(3) The width and working dimensions of the trench bottom should be determined based on the actual site conditions and pipeline laying methods.
(4)局部超挖部分应回填夯实。当沟底无地下水时,超挖在0.15m以内,可接纳原土回填;超挖在0.15,以上,可接纳石灰土处置惩罚。当沟底有地下水或水量较大时,应接纳级配砂石或自然砂回填标高。超挖部分回填后压实,其密实度应靠近原地基自然土的密实度。
(4) Partial over excavation should be backfilled and compacted. When there is no groundwater at the bottom of the ditch, if the over excavation is within 0.15m, the original soil can be used for backfilling; If the over excavation is above 0.15, lime soil treatment can be used. When there is groundwater or a large amount of water at the bottom of the ditch, graded sand or natural sand should be used to backfill to the elevation. After backfilling the over excavated part, the compactness should be close to the compactness of the natural soil in the original foundation.
(5)在湿陷性黄土地区,不宜在雨期施工,或在施工时切实扫除沟内积水,开挖时应在沟底预留值0.03~0.06m厚的土层举行压实处置惩罚。
(5) In areas with collapsible loess, it is not advisable to carry out construction during rainy periods or to effectively drain the accumulated water in the ditch. During excavation, a soil layer with a thickness of 0.03-0.06m should be reserved at the bottom of the ditch for compaction treatment.
(6)沟底遇有放弃修建物、硬石、木头、垃圾等杂物时必需,并应铺一层厚度不小于0.15m砂土或素土,整平压实及设计标高。
(6) When encountering abandoned structures, hard stones, wood, garbage and other debris at the bottom of the ditch, they must be removed, and a layer of sand or plain soil with a thickness of no less than 0.15m should be laid, leveled and compacted to the design elevation.
(7)对软土基及特殊侵蚀土壤,应按设计要求处置惩罚。
(7) Soft soil foundation and special corrosive soil should be treated according to design requirements.
2.回填土。
2. Backfill soil.
(1)不得接纳冻土、垃圾、木料及软性物质回填。管道两侧及管顶以上0.5m内的回填土,不得含有碎石、砖块等杂物,且不得接纳灰土回填。距管顶0.5m以上的回填土中的石块不得多于10%、直径不得大于0.1m,且匀称漫衍。
(1) Frozen soil, garbage, wood, and soft materials shall not be used for backfilling. The backfill soil on both sides of the pipeline and within 0.5m above the top of the pipeline shall not contain debris such as crushed stones and bricks, and shall not be filled with gray soil. The number of stones in the backfill soil at a distance of more than 0.5m from the top of the pipe shall not exceed 10%, and the diameter shall not exceed 0.1m, and shall be evenly distributed.
(2)沟槽的支持应在管道两侧及管顶以上0.5m回填完毕并压实后,在包管的情形下举行拆除,并应接纳细砂填实误差。
(2) The support of the trench should be backfilled and compacted on both sides of the pipeline and 0.5m above the top of the pipeline, and then removed while ensuring safety. Fine sand should be used to fill the gaps.
(3.)沟槽回填时,应先回填管底悬空部位,再回填管道两侧。
(3.) When backfilling the trench, the suspended area at the bottom of the pipe should be backfilled first, and then both sides of the pipe should be backfilled.
(4)回填土应分层压实,每层虚铺厚度宜为0.2~0.3m,管道两侧及管顶以上0.5m内的回填土必需接纳人工压实,管顶0.5m以上的回填土可接纳小型机械压实,每层虚铺厚度宜为0.25~0.4m。
(4) Backfill soil should be compacted in layers, with a virtual paving thickness of 0.2-0.3m for each layer. Backfill soil on both sides of the pipeline and within 0.5m above the pipe top must be manually compacted. Backfill soil above 0.5m above the pipe top can be compacted using small machinery, and the virtual paving thickness for each layer should be 0.25-0.4m.
(5)回填土压实后,应分层检查密实度,并做好回填纪录。
(5) After the backfilling soil is compacted, the compactness should be checked layer by layer and backfilling records should be kept.
3.警示带铺设。
3. Lay warning tape.
(1)埋设燃气管道的沿线应一连铺设警示带。警示带铺设前应将铺设面压实,并平整的铺设在管道的正上方,距管定的距离宜为0.3~0.5m,但不得铺设于路基和路面内。
(1) Warning tapes should be continuously laid along the buried gas pipeline. Before laying the warning tape, the surface should be compacted and laid flat above the pipeline. The distance from the pipeline should be 0.3-0.5 meters, but it should not be laid in the roadbed or road surface.
(2)警示带宜接纳黄色聚乙烯等不易剖析的质料,并印有显着、牢靠的警示语,字体不应小于100*100mm。
(2) The warning tape should be made of materials such as yellow polyethylene that are not easily decomposed, and should be printed with clear and firm warning messages. The font should not be less than 100 * 100mm.
本文由供水警示带提供手艺支持,更多的详细精彩内容请点击jdb电子网站,我们将会一心一意为您提供知足的效劳。
This article is supported by water supply warning tapes. For more detailed and exciting content, please click on our website We will wholeheartedly provide you with satisfactory service.