地埋警示桩怎么埋

泉源:/ 宣布时间:日期:2022-07-27 0
地埋警示桩使用时代不需要操心维护,尚有一个较量主要的方面就是它具有很好的防盗性,它是一次性成型,更好的包管了它在使用时代能够更好的施展作用。那么地埋警示桩怎么埋?
There is no need to worry about maintenance during the use of the buried warning pile. Another important aspect is that it has good anti-theft property. It is formed at one time, which better ensures that it can play a better role during the use. So how to bury the warning pile?
1.模具制作。 示警桩模具接纳圆钢加工制作,分左右两半,并且上面焊有紧固螺栓,以避免其 振捣张开,影响其尺寸。
1. Mold making. The warning pile mold is made of round steel, divided into left and right halves, and is welded with fastening bolts to prevent its vibration from opening and affecting its size.
2.示警桩预制 。预制接纳集中预制,按设计要求,先浇筑 ;げ阍俜湃朐ぶ坪玫呐浣,再接纳分层浇筑,用振捣器捣密实后浇筑第二层,待浇筑后抵达凝固强度后,翻开模具,将其外貌缠笼罩薄膜举行养生。
2. Warning pile prefabrication. The prefabrication adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, then the prefabricated reinforcement is placed, and then the layered pouring is adopted. The second layer is poured after being compacted with a vibrator. After the pouring reaches the solidification strength, the mold is opened, and its surface is wrapped with a film for curing.
3.示警桩基础开挖 。示警桩施工工具流动性大,琐屑的特点,基础接纳人工开挖,并将底部整压实。
3. Warning pile foundation excavation. Warning pile construction tools have the characteristics of large fluidity and fragmentation. The foundation is excavated manually and the bottom is compacted.
地埋警示桩
4.喷涂发光漆 。严酷按图纸要求的颜色、间距涂刷发光漆。
4. Spray luminous paint. Apply luminous paint in strict accordance with the color and spacing required by the drawing.
别的开工前要行园地整理,包括开挖区的垃圾、杂草、不可使用的表土及其障碍物,应对丈量控制点及放线位置举行校核?诒呦哂τ凶愎皇康牡芈窬咀。并要注重避免移位、损坏,施工方需约请村委和群众代表一同加入放线事情。阻止爆发不须要的矛盾,包管工程开工顺遂举行。
In addition, the site shall be cleared before construction, including garbage, weeds, unusable topsoil and obstacles in the excavation area. The measurement control points and setting out positions shall be checked. The excavation sideline shall have a sufficient number of buried warning piles. Attention should also be paid to prevent displacement and damage. The construction party should invite the village committee and mass representatives to participate in the setting out work. Avoid unnecessary contradictions and ensure the smooth commencement of the project.
开挖基础的深度和宽度要切合按设计要求。若有异常征象应实时向监理、业主汇报,待做来由置决议后再继续施工 ;靥钔烈局ひ缶傩谢靥,不然一律不予验收。
The depth and width of the excavated foundation shall meet the design requirements. If there is any abnormal phenomenon, it should be reported to the supervisor and the owner in time, and the construction can be continued after the decision is made. The backfill shall be backfilled as required, otherwise it will not be accepted.
地埋警示桩怎么埋?以上就是问题的相关解答了,若是您对此感兴趣或者有需求要购置,就关注网站联系jdb电子咨询吧。
How to bury the warning pile? The above is the relevant answer to the question. If you are interested or need to buy, please follow the website Contact us for advice.